BelowZero-V.43225 - Error in the power grid when multiple transmitters deliver energy to the base
Mr_Weesly
Join Date: 2020-02-27 Member: 258325Members
My base is powered by 2 energy lines. A solar plant on the surface and thermal power plants. Both are connected to the base via power transmitter. The solar system provides 3000 energy and the Thermal 750.
Each net on its own is correctly recognized and treated in the base. However, if I connect both nets to the base at the same time, the production of the thermal is no longer included in consumption.
This means: energy consumption at night, should be absorbed by the thermal. However, this is not the case. The buffer of 750 is correctly added to the amount of the solar system, but the continuous delivery does not take place and the energy storage is emptied.
Each net on its own is correctly recognized and treated in the base. However, if I connect both nets to the base at the same time, the production of the thermal is no longer included in consumption.
This means: energy consumption at night, should be absorbed by the thermal. However, this is not the case. The buffer of 750 is correctly added to the amount of the solar system, but the continuous delivery does not take place and the energy storage is emptied.